← Alert archive

Matter continuity · Plymouth · Planning Board

Site plan, 185 Water St

Current status is the latest outcome on this page. Next hearing is shown only when the cited text includes a hearing date.

The same cited matter across posted agendas, continuances, packet changes, and decisions. Events remain separate; distinct cases are never merged.

Key facts

Address
185 Water St (p. 1)
Map
Map 014A (p. 1)
Lot
Lot 021A (p. 1)
Relief
Site Plan Review (p. 1)

Not stated in the cited text: Applicant, Owner, Representative, Block, Zoning district, Bylaw sections, Statute sections, Hearing date, Hearing time, Hearing location, Continued from, Packet link.

Watch match · Agenda item · 2026-10-14

Site Plan Review 26-7 Town of Plymouth Harbormaster, 185 Water St, Map 014A Lot 021A Plymouth Harbor Boat Ramp Improvements & Coastal Resiliency Project will consist of concrete seawall reconstruction, drainage improvements, re-paving, boat ramp extension, aluminum gangway, floating dock and support pilings, and miscellaneous work

Site Plan Review 26-7 Town of Plymouth Harbormaster, 185 Water St, Map 014A Lot 021A Plymouth Harbor Boat Ramp Improvements & Coastal Resiliency Project will consist of concrete seawall reconstruction, drainage improvements, re-paving, boat ramp extension, aluminum gangway, floating dock and support pilings, and miscellaneous work
Plymouth Planning BoardAgendap. 1plymouth-ma.gov

ClassificationTownSignal coverage record: routine Plymouth Planning Board monitoring identified this cited land-use matter.